Isomerization reactors
InFORMATION
Request a Quote
Details
Specifications
Standards
GOST 34347 / API RP 934 / ASME Sec. VIII / GB 150
Operating Pressure
From 1.5 to 3.5 MPa
Medium Temperature
from 120 to 280°C
Materials
Steel 09G2S, 16GS, 12XH (or equivalents according to ASME, GB, EN)
Design Type
Vertical cylindrical apparatus of shaft type with a fixed catalyst bed and axial feed of feedstock
Type of Catalyst
Platinum on various supports (chlorinated alumina oxide, sulfated zirconia oxide or zeolite)
Materials
Other materials available upon request.
Main advantages
Working Media
Pentane-Hexane Fraction (Light Naphtha)
Pre-hydrotreated and dehydrated straight-run gasoline fraction with boiling range NK-70 °C, enriched with n-pentane and n-hexane.
01
Aromatic Extraction Raffinates
Non-aromatic paraffins after extraction of aromatics (benzene and toluene), directed to isomerization to increase octane number
02
Recycle Fraction of n-Alkanes
Return flow of n-pentane and n-hexane from isomerate separation columns (deisopentanizer/deisophexanizer)
03
04
05
06
Areas of application
Low-Temperature and Medium-Temperature Isomerization Units
Production of environmentally friendly high-octane components for commercial gasoline with minimal benzene, aromatic, and olefin content.
Low-Temperature and Medium-Temperature Isomerization Units
Production of environmentally friendly high-octane components for commercial gasoline with minimal benzene, aromatic, and olefin content.
Pentane Fraction Isomerization Units in Petrochemical Productions
Production of high-purity isopentane as feedstock for subsequent synthesis of monomers (isoprene).
Pentane Fraction Isomerization Units in Petrochemical Productions
Production of high-purity isopentane as feedstock for subsequent synthesis of monomers (isoprene).
Company
TyazhPromMash
Russian Certification Services
GOST R Certification
EAC Explosion Protection Certification
Type Approval of Measuring Instruments
List of Components
01
Supply Completeness
Cylindrical body with support skirt and loading/unloading hatches, upper feed distribution device, support-grate with filtering meshes, anti-vortex baffles, set of flanges, studs and gaskets, multi-zone thermal pockets, commissioning spare parts kit, set of permitting and shipping documentation, etc.
02
03
04
05
06
Advantages
01
02
03
04
05
Request a Quote
Ready to place an order or need a commercial proposal? Leave your details, and your personal manager will prepare all necessary documents.
submit